Advantages and Disadvantages of Flexible Pavement

By Shubham Malu DEPARTMENT OF CIVIL ENGINEERING NDMVPSs KBTCOE NASHIK CHAPTER 1 11 INTRODUCTION Rainwater harvesting is a technology used to collect convey and store rain for later use from relatively clean surfaces such as a roof land surface or rock catchment. The bituminous material is more often asphalt whose viscous nature allows significant plastic deformation.


Civil Made Easy Components And Advantage Disadvantages Facebook

Flexible pavement is composed of a bituminous material surface course and underlying base and subbase courses.

. Easily socketed into hard rock and can penetrate through subsurface obstructions andor boulders encountered during installation. This type of cracking is associated with the unusual expansion and contraction of concrete in the rigid pavement and due to improper mixing or aging of asphalt or poor quality asphalt in flexible pavement. Most asphalt surfaces are built on a gravel base although some full depth asphalt surfaces are built directly on the subgrade.

The road can be used for traffic within 24 hours in flexible pavement. Block cracking is mainly caused by shrinkage of the. Hollow blocks have a poor bearing capacity as the average mass of wall decoration materials is decreased and the load-bearing capacity is often reduced.

The Civil Engineerings Blog or Website is The best Civil Engineering Websites Knowledge Construction portal on the internet. It is really risky to hang large things on walls like this. Top 20 AAC Block Company in India Application of Hollow Block.

High load capacity in both tension and compression. Block cracking is another cracking seen on highway pavements that form a box-like crack on the surface. In flexible pavement Force of friction is less Deformation in the subgrade is not transferred to the upper layers.

The water is generally stored in a rainwater tank or directed to recharge. Minimal vibration and disturbance to adjacent structures in close proximity during installation. Such blocks can be found in load-bearing towers moderate apartment complexes office buildings.

This site is made for educational purpose so as to help the fellow CE students where you can learn about QSurveying Land Surveying AutoCAD Civil 3D QAQC and softwares Basic Knowledge Civil Engineering Site Knowledge. The road cannot be used until 14 days of curing in rigid pavement. Rolling of the surfacing is not needed in Rigid pavement.


Civil Made Easy Components And Advantage Disadvantages Facebook


Flexible Pavement Versus Rigid Pavement